EXECUTIVE SUMMARY

 i.    This Quarterly Environmental Monitoring and Audit (EM&A) Summary Report is prepared for Contract No. SPW 07/2020 “Environmental Team for Construction of Yuen Long Effluent Polishing Plant Stage 1”. Drainage Services Department (DSD) has appointed Fugro Technical Services Limited (FTS) to undertake the Environmental Team services for the project and implement the EM&A works.

ii.    This is the 3rd Quarterly EM&A Summary Report for the Contract which summaries findings of the EM&A programme during the reporting period from 1 October 2021 to 31 December 2021. As informed by the Contractor, major activities in the reporting period shown in section 1.4.1.

iii.     The EM&A methodology has been effective in monitoring the environmental impacts of the Project and the effectiveness of the mitigation measures. The data collected were useful in determining whether the Project had caused unacceptable impacts on the sensitive receivers. Analysis of all EM&A data collected throughout the baseline and the impact periods demonstrated the environmental acceptability of the Project.

Breaches of Environmental Quality Performance Limits (AL levels)

iv.    No Action and Limit Level exceedance was recorded for air quality monitoring and construction noise monitoring in the reporting period.

v.    No Action and Limit Level exceedance was recorded for water quality in the reporting period.

vi.    No Action / Limit Level exceedance was recorded for noise levels at stations (NMS1 and NMS2) in close proximity to the active ardeid night roosts during the reporting period.

vii.     No Action / Limit Level exceedance for the ecological monitoring of birds during the reporting period.

viii.    No corrective actions were required according to the Event-Action Plans.

Land Contamination

ix.   Regular site inspection was carried out to ensure the recommended mitigation measures are properly implemented. Site investigation (SI) work was completed by 4th August 2021 and the signed final Contamination Assessment Report (CAR) for Main Storeroom & Workshops was submitted to EPD on 1st November 2021. The signed final Contamination Assessment Report (CAR) for Mechanical Workshop was submitted to EPD on 23rd November 2021. No contaminated soil and ground water was found within the Main Storeroom & Workshop and the Mechanical Workshop, hence no remedial action is required.

 

Complaint Log

x.    No complaints were received in the reporting period.

Notifications of any Summons and Successful Prosecutions

xi.    No notifications of summons and prosecutions were received in the reporting period.

Reporting Change

xii.    There were no reporting changes during the reporting period.


 

Contents

1.        INTRODUCTION  

2.       SUMMARY OF EM&A REQUIREMENTS AND MONITORING RESULTS 

3.       LANDSCAPE AND VISUAL 

4.       LAND CONTAMINATION  

5.       SITE INSPECTION AND AUDIT 

6.       NON-COMPLIANCE, COMPLAINTS, NOTIFICATIONS OF SUMMONS AND SUCCESSFUL PROSECUTIONS 

7.       IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURE 

8.       CONCLUSION AND RECOMMENDATION  

 


 


Tables

Table 1.1 – Contact Information of Key Personnel

Table 1.2 – Main Construction Works Carried out in the Reporting Period

Table 2.1 – Air Quality and Noise Monitoring Location

Table 2.2 – Coordinates of Water Quality Monitoring Locations

Table 2.3 – Summary of Water Quality Exceedance

Table 5.1 – Observations and Recommendations of Site Audit

Table 5.2 – Waste Generated by the Construction and Disposal Ground

Table 7.1 – Summary of EP Submissions Status


Figures

Figure 1         Location of Proposed Yuen Long Effluent Polishing Plant

Figure 2         Air Quality Monitoring Locations

Figure 3         Noise Monitoring Locations

Figure 4         Water Quality Monitoring Locations

Figure 5         Ecology Monitoring Locations


Appendices

Appendix A    Construction Programme

Appendix B    Project Organization Chart

Appendix C    Action and Limit Level

Appendix D   Graphical Presentation of Monitoring Data

Appendix E    Event and Action Plan

Appendix F    Waste Flow Table

Appendix G   Implementation Status of Environment Mitigation Measures

Appendix H   Cumulative statistics on Environmental Complaints, Notifications of Summons and Successful Prosecutions